News from Notch Consulting, Inc.

November 21, 2008

Sid Richardson to Idle Capacity at US Carbon Black Plant

Filed under: Carbon Black — Notch @ 11:28 pm

On Friday, November 21, 2008, Sid Richardson Carbon & Energy announced that it would idle approximately 90 million pounds (about 40,000 tonnes) of tread grade carbon black capacity at its plant in Addis, Louisiana. The shut down is considered temporary, and the company has no plans to drop production of any specific grades at this time. Customers should not be impacted by the move, as Sid Richardson has adequate tread capacity at its other two US plants (located in Big Spring, Texas and Borger, Texas) to meet shipments. In addition to the shutdown, Sid Richardson has postponed plans to install a cogeneration unit at the Addis plant.

Here is the announcement.

2 Comments »

  1. […] Details on Sid Rich Addis Shut Down Earlier this week, this blog reported on an announcement by Sid Richardson to shut down one of its tread units at its carbon black plant in Addis, […]

    Pingback by Additional Details on Sid Rich Addis Shut Down « News from Notch Consulting Group — November 25, 2008 @ 1:36 pm

  2. […] Rich Addis Unit Back Up By Notch In November, this blog reported (here and here) that Sid Richardson had idled one of its tread units at its carbon black plant in Addis, […]

    Pingback by Sid Rich Addis Unit Back Up « News from Notch Consulting Group — January 28, 2009 @ 12:08 pm


RSS feed for comments on this post. TrackBack URI

Leave a Reply

Powered by WordPress.com.

%d bloggers like this: